Connect with us

COMMUNITY REPORT

Relief as Delta Commences Construction of ₦29.8bn Aboh–Akarai Road, Okiri River Bridge in Ndokwa East

Published

on

The Delta State Government has commenced work on the construction of the 10.1-kilometre Aboh–Akarai Road, including a major bridge across the Okiri River, in Ndokwa East Local Government Area, at a total cost of ₦29.8 billion.

The Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze, disclosed this during an inspection visit to the project site, where he was accompanied by the Director of Highways, Engr. Solomon Aghagba, and other top officials of the Ministry of Works.

According to the Commissioner, the project is designed to open up Akarai community and its environs by providing a direct road link to Aboh, thereby eliminating the long-standing dependence on river transportation.

He noted that Ndokwa East is predominantly agrarian, with residents largely engaged in farming and fishing, but poor access caused by difficult terrain has over the years hindered economic activities and business growth.

“This project is intended to open up more avenues for the people of Akarai to link Aboh without having to sail through the river. Because of the nature of the topography, it has been very difficult for the people to do business and succeed as entrepreneurs,” Izeze said.

He explained that the road and bridge project aligns with Governor Sheriff Oborevwori’s MORE Agenda, stressing that the “O” in the agenda represents opportunities for all Deltans, regardless of whether they live in riverine, rural or urban areas.

Advertisement

The Commissioner revealed that the bridge component of the project spans seven sections, an upgrade from the initial five-span design, to ensure durability and resilience against flooding.

He said the redesign was informed by the 2012 flood level, which was used as the benchmark to guarantee that the bridge would withstand future flooding and outlive changing environmental conditions.

Izeze added that contractors had returned to site immediately after the Christmas holidays and that preliminary works, including bush clearing, had been completed.

He stated that piling would commence once the water level of the river recedes further, expressing optimism that substantial progress would be achieved before the end of the year.

“This is one of the many promises of His Excellency that are being kept across the 25 local government areas of the state,” he said.

Also speaking, the contracting engineer, Lichaa Geagea, confirmed that preparatory works were ongoing, including site clearing, access opening, and arrangements for key facilities such as the batching plant, iron bending yard and beam seating areas.

Advertisement

He disclosed that access roads to the bridge abutments had been opened and that heavy equipment, including excavators, cranes and mixers, would arrive on site before the end of the month.

Geagea said piling for the bridge is expected to begin next month, while bush clearing for the remaining sections of the road would soon be completed.

He added that refilling works, box culverts and other drainage structures would also commence before the end of the month.

The Aboh–Akarai Road and Okiri River Bridge project is expected to significantly boost mobility, economic activities and social integration in Ndokwa East, particularly for riverine communities that have long struggled with accessibility challenges.

Continue Reading
Advertisement
Click to comment
FEATURED5 hours ago

Coup Trial: Islamic Cleric Says ₦10m He Got Was for Prayers, Not to Overthrow Tinubu

BUSINESS6 hours ago

Tinubu Assures Global Investors in Paris of His Post-2027 Agenda

social media
NEWS8 hours ago

‘My Scorecard’ — Sen. Ned Nwoko Reels Out Achievements Ahead of Second Term Declaration

Port Harcourt Refinery
BUSINESS20 hours ago

Warri, Port-Harcourt Refineries to Resume Operations as NNPC, China Sign Resuscitation Deal to Boost Petrochemical Output

COMMUNITY REPORT1 day ago

Ugbolu Land Dispute: Delta Govt Calls for Calm as Protesters Storm Govt House Asaba

COMMUNITY REPORT1 day ago

Clergyman Distributes Food Items to Vulnerable Nigerians in Delta

FEATURED1 day ago

Delta Govt Directs Intelligence-driven Response as Phone Gadget Dealers Storm Govt House Asaba Over Targeted Robberies

BUSINESS1 day ago

Dangote Repels Alleged Rift with Elumelu, Claims on Refinery Financing

COMMUNITY REPORT1 day ago

Community Policing: Isoko South Chair Begins Construction of Police Station in Border Town, Enwhe

FEATURED1 day ago

Tensions Mount Delta as Ijaw, Urhobo Indigenous People Set to Resist Delayed INEC Delineation Report

OPINION1 day ago

A RISK WITH OKOWA’S APC CANDIDACY, BY CHIDI CHUKWUTEM

BUSINESS2 days ago

Grey Registers as Payment Service Provider Under Canada’s RPAA Framework

FEATURED2 days ago

U.S. Lifts Visa Ban on Nigerian, Other Foreign Doctors Amid Healthcare Shortage

Peter Obi
FEATURED2 days ago

Peter Obi Explains Why He Left ADC

FEATURED2 days ago

Tinubu Hails Former Boss and Confidant Pius Akinyelure, Ex-NNPC Chair, at 84

Advertisement
Advertisement

z